Oranje-Eco Oranje-Eco

Market RadarBESS & Batterijparken

BESS & Batterijparken

DNV Research: Large-Scale Batteries Can Alleviate Grid Congestion

Recent research by DNV, commissioned by the Dutch Ministry of Economic Affairs and Climate Policy, confirms the potential of large-scale battery systems. These systems can reduce peak load by 15 to 30 percent at a significant number of grid congestion points. The study concludes there are no technological barriers to the widespread deployment of batteries for grid congestion relief.

Source: Bing News: netcongestie batterij · Netherlands NLEN

Large-scale battery systems are poised to play a significant role in alleviating grid congestion in the Netherlands. This conclusion stems from a recent study conducted by DNV, commissioned by the Dutch Ministry of Economic Affairs and Climate Policy (EZK) between January and June 2026. The research focused on batteries with a capacity exceeding 1 megawatt, connected to the medium, high, and extra-high voltage grids.

According to DNV's findings, these battery systems can be deployed at 60 to 80 percent of existing congestion points. At these locations, it is possible to reduce peak load by 15 to 30 percent. The study emphasizes that there are no technological barriers preventing the widespread implementation of batteries as a solution for grid congestion.

The research indicates that nearly all large-scale batteries connected in the coming years will operate at least in a congestion-neutral manner. This is facilitated by new contract forms, such as the time-bound transport right (TDTR) and the capacity steering contract (CSC). These instruments enable grid operators to manage the transport capacity of batteries, thereby preventing additional strain on the electricity grid during peak demand. Adjusted rules for congestion management also contribute, allowing grid operators to mandate participation in congestion management for companies with batteries exceeding 1 megawatt.

DNV asserts that additional policies to prevent batteries from exacerbating congestion are unnecessary. The focus should instead be on actively deploying storage for congestion relief, particularly at technically and economically viable locations. While the primary goal of battery deployment is not to avoid grid expansion, it does contribute to more efficient utilization of existing grid capacity, enabling faster connection for customers currently on waiting lists.

Arendo Schreurs, director of Energy Storage NL, expressed satisfaction with the report's findings. He stated that this research independently demonstrates that energy storage can make a genuine contribution to resolving grid congestion. The next step, according to him, involves implementation, including identifying where batteries are needed and scaling up flex tenders and contract conditions that make batteries feasible as congestion relievers.

Source: Solar365

Want to know what this means for you?

Talk to Oranje-Eco →
  • netcongestie
  • batterijopslag
  • BESS
  • energieopslag
  • DNV
  • Nederland

This article is an Oranje-Eco summary of a report by Bing News: netcongestie batterij. Read the original: Bing News: netcongestie batterij.

How do you foresee the role of large-scale battery systems in addressing future grid congestion in the Netherlands?

No comments yet - be the first.

Leave a comment

Comments are shown after moderation. We only store your name and comment - see our privacy statement.